Case studies

Lietuvos Geleznikeliai Control Room

We remodeled, for Indra Sistemas, the main control center of the Lithuanian railway company, Lietuvos Gelezinkeliai, located in Vilnius. The scope of our project has been the integral design of the control center, technical assistance for coordination and supervision of different activities and supply and install all technical and auxiliar furniture used, as well as the control room, crisis room and control power room.

 

We must emphasize the use of control consoles like KOMPAS console as the main element in the organization of all work posts of users. We take KOMPAS console as a reference when we design all operating environments 24x7.

Gallery