Case studies

Guard House Control Room

Design project for the workposts located in the Guard House Control Room conceived as such as to comprise a Main Control Area and a Supervisor Area, separated with a glass partition.
 
The proposal employs Kompas console, a technical solution specifically designed for 24x7 operations environments, which enables a perfect space management, taking into account the fundamental principles which the equipment used in a control centre must meet , as defined by the ISO11064 normative. KOMPAS console introduces an innovative element called FUNCTIONAL ARC, inspired from the new wave architecture of the 21st century, which is the vertebral axis of the product allowing the sustention of all the main elements.
 CASE STUDY
 
LATEST CASE STUDIES

RESOURCES

GALLERY

SOCIAL MEDIA